Home » Products » Ball Valve » Flange Turbine Electric Manual 4-Way3-Way Switch Coker Ball Valves

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
sharethis sharing button

Flange Turbine Electric Manual 4-Way3-Way Switch Coker Ball Valves

The 3 - Way Ball Valve is a key component in fluid control systems. It offers a reliable and efficient way to control the flow of fluids in three different directions.
Availability:
Quantity:

Overview

The valve is constructed with high - quality materials to ensure durability and long - term performance. It has a simple and intuitive design, making it easy to operate and maintain. The ball inside the valve is precisely machined to provide accurate flow control and tight sealing.


Application

It is commonly used in industrial mixing processes, such as in the production of paints, coatings, and adhesives. It can also be found in the pharmaceutical industry for the mixing and transfer of liquid medications. In addition, it is used in the water and wastewater treatment industry for flow distribution and diversion. In irrigation systems, it is used to control the flow of water to different areas.


FAQ

   Q: What is the difference between a floating ball and a trunnion - mounted ball in a 3 - Way Ball Valve?

   A: A floating ball is supported only by the seat rings, and it moves slightly with the pressure of the fluid. A trunnion - mounted ball, on the other hand, is supported by trunnions at the top and bottom, which allows for better handling of high - pressure and high - flow applications and reduces the force required to operate the valve.

   Q: Can the valve be used with abrasive fluids?

   A: It depends on the material of the valve and the severity of the abrasion. If the fluid contains abrasive particles, it is recommended to choose a valve with a hard - faced seat and ball, such as a metal - seated valve, to improve the wear resistance.

   Q: How do I install the 3 - Way Ball Valve?

   A: The valve should be installed in accordance with the manufacturer's instructions. Generally, it should be installed in a horizontal or vertical position, depending on the specific application. Make sure to connect the valve properly to the piping system and ensure that there is no misalignment or stress on the valve body.


MAIN FEATURES

The sturdy one-piece ball and stem

provides optimal strength, and is well suited to applications where fouling due to coke fines are a concern. The one-piece design avoids the problems generally associated with the more conventional two-piece ball and stem, which is highly susceptible to solids buildup in the ball-stem joint and a resulting increase in operating torques.Avoids hysteresis and misalignment.


Design Features

A Lantern ring

with steam block and extra deep stuffing box minimizes the risk of leakage occurring through the packing chamber. Live-loading is available on request.

Strong bellows

offer a unique seat loading design that maintains the floating seats in constant contact with the ball and ensures a positive seal.

Velan's unique scraper type seats design

scrapes coke buildup from the surface of the ball during each cycle. Seats are hard-faced to ensure a long, trouble-free service life.

Steam purges

to bellows and body area ensure the valve cavities are kept free of coke buildup.

The stem coupling

is designed to perform three main functions

Protect against "overtorquing" of the stem.

Protect the actuator components.

Protect against an unintentional switch into bypass (typically applies to four-way switch).

Automation

The electric, hydraulic or pneumatic actuator is selected in function of coker service. A large torque safety factor ensures the valve will cycle under the most stringent conditions. When selecting actuators, special attention is paid to the coker deck environment.

Brand: Yuefeng
Applicable Media: Water, Oil, Gas, Nitric Acid, Acetic Acid
Certification: CE/RoHS/ISO9001-2008
Original Lishui,Zhejiang Province
Packing: Plastic Bag, Carton & Plywood Case/According to customers' requirement.
Payment: T/T, L/C, D/P, Western Union.
Port: Shenzhen, Customers' Request
Delivery Time: Within 15days after receiving T/T deposit Payment
Term of Delivery: EXW/FOB/CNF/CIF, Customers' Request


Production process
Production Line-1

Production Line-2
Certificates & Test reports
Company Qualification
Packing&Shipping
Packing & Shipping

Telephone

+86-18957041370

Products

Quick Links

Service

​Copyright © 2025 Yuefeng Valve. All Rights Reserved. SitemapPrivacy Policy.